Installation Checklist
CHECK OK / NOTES
Delivery
Supplied complete no transit damage
Position
Level and stable on sound, waterproof, self draining floor
Water
Isolator valve fitted Accessible, all fittings sound, no leaks
DCVs fitted (Washtech only) Correct direction
Temperature 65 ± 5°C
Flow rate Minimum 20 litres per minute
Pressure 200-350 kpa, limiter fitted if above this range
Booster fitted if below this range
Cold water when required Pressure not above 350 kpa
Hardness Filter or softening if required
Power
Isolating switch Fitted, functional and accessible
Supply as specified Voltage, current, circuit breaker
Waste
Usually 40 mm Sound, no leaks
Air gap on pumped drain
Chemicals
product name container no leaks primed conc.OK
Detergent
Rinse Aid
Machine operation
Run several cycles
Confirm correct operation Including correct fill levels
Operator training
Confirm Operator has copy of Operator Manual and is familiar with procedures
Start-up Model / Serial
Pre-rinse and racking Owner
Machine operation Location
Drain Technician
Clean Date
Shut-down Signed